Indiana Code § 8-1-7.9-8

"Expedited generation resource plan"
Open in Lexace · Ask the AI about this section
Sec. 8. As used in this chapter, "expedited generation resource plan", or "EGR plan", means a plan developed by an energy utility for acquiring generation resources to meet load growth that exceeds the lesser of: (1) five percent (5%) of the energy utility's average peak demand over the most recent three (3) calendar years; or (2) one hundred fifty (150) megawatts.