Indiana Code § 8-1-30.9-9

Water utility's recovery of costs incurred; inclusion in rate base or revenue requirement; completed construction; cancellation of project; construction subject to subsequent review; limitation on recovery of costs exceeding estimate
Open in Lexace · Ask the AI about this section
Sec. 9. Absent fraud, concealment, or gross mismanagement, a water utility shall recover through rates the actual costs the water utility has incurred in reliance on a certificate issued under this chapter as follows: (1) If construction of a long haul water pipeline has been subject to ongoing review under section 8(a) of this chapter and the commission finds the construction of the long haul water pipeline has been completed, the costs of construction approved by the commission during the ongoing review shall be included, without further commission review, in: (A) the water utility's rate base, in the case of a public utility; or (B) the water utility's revenue requirement for extensions and replacements expense, depreciation expense, or debt service expense, as applicable, in the case of a: (i) municipally owned utility; (ii) not-for-profit utility; (iii) conservancy district; or (iv) regional water district. (2) If construction of a long haul water pipeline is subject to subsequent review under section 8(b) of this chapter and the commission finds the construction of the long haul water pipeline to be completed, the costs of construction that do not exceed the estimate under section 7(e)(1) of this chapter, and that are not shown to result from inadequate quality controls, shall be included in: (A) the water utility's rate base, in the case of a public utility; or (B) the water utility's revenue requirement for extensions and replacements expense, depreciation expense, or debt service expense, as applicable, in the case of a: (i) municipally owned utility; (ii) not-for-profit utility; (iii) conservancy district; or (iv) regional water district. However, inclusion of costs in excess of the estimate under section 7(e)(1) of this chapter in the water utility's rate base or revenue requirement is not permitted unless shown by the water utility to be necessary and prudent in the construction of the long haul water pipeline. (3) If a long haul water pipeline has been canceled as a result of: (A) the modification or revocation of the certificate under this chapter; or (B) local permitting or other issues beyond the water utility's control; and the long haul water pipeline's construction has been subject to ongoing review under section 8(a) of this chapter (including reviews after cancellation), the costs of construction approved by the commission during the review shall be recovered by the water utility by inclusion in rates and amortization over a reasonable time to be determined by the commission. A water utility that is a public utility shall be permitted to earn a return, computed using the water utility's authorized rate of return, on the unamortized balance. (4) If a long haul water pipeline has been canceled as a result of: (A) the modification or revocation of the certificate under this chapter; or (B) local permitting or other issues beyond the water utility's control; and the long haul water pipeline's construction is subject to subsequent review under section 8(b) of this chapter, the costs of construction incurred before cancellation that were included in the estimate under section 7(e)(1) of this chapter and that have not been shown to result from inadequate quality controls shall be recovered by the water utility by inclusion in rates and amortization over a reasonable time to be determined by the commission. A water utility that is a public utility shall be permitted to earn a return, computed using the water utility's authorized rate of return, on the unamortized balance. However, costs that were not included in the estimate under section 7(e)(1) of this chapter may not be included in rates unless shown by the water utility to be necessary and prudent in the construction of the long haul water pipeline.   IC 8-1-31 Chapter 31. Infrastructure Improvement Charges               8-1-31-1 Applicability of definitions             8-1-31-1.3 "Adjustment amount"             8-1-31-1.5 "Adjustment revenues"             8-1-31-2 Repealed             8-1-31-3 Repealed             8-1-31-4 Repealed             8-1-31-5 "Eligible infrastructure improvements"             8-1-31-5.2 "Eligible utility"             8-1-31-5.5 "Infrastructure improvement costs"             8-1-31-5.9 "Not-for-profit utility"             8-1-31-6 "Pretax return"             8-1-31-7 Repealed             8-1-31-8 Petition by eligible utility for rate adjustment             8-1-31-9 Hearing and order; incorrect calculation of adjustment amount; authority of commission to provide correct calculation             8-1-31-10 Petition for change in initial adjustment amount             8-1-31-11 Pretax return factors             8-1-31-11.5 Allowable recovery for municipally owned utility; factors             8-1-31-11.6 Allowable recovery for not-for-profit utility; factors             8-1-31-12 Cost of common equity             8-1-31-13 Limit on total adjustment revenues; exceptions             8-1-31-14 Adjustment amount calculation; reconciliation             8-1-31-15 Public utilities; resetting of adjustment amount after increase in basic rates and charges             8-1-31-15.5 Municipally owned utilities and not-for-profit utilities; resetting of adjustment amount upon approval of new basic rates and charges that include eligible infrastructure improvements             8-1-31-16 Filing of petition not general increase in basic rates and charges             8-1-31-17 Adoption of other procedures

‹ Prev All Indiana sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.