Indiana Code § 36-9-40-8

Filing of cost estimate by county engineer; limitation on entry into contract
Open in Lexace · Ask the AI about this section
Sec. 8. (a) At least ten (10) days before the date fixed for a hearing under section 7 of this chapter, the engineer of the county shall file with the works board an estimate of the maximum cost of construction of the system proposed by the works board.       (b) A county may not enter into a contract under the preliminary resolution if the contract exceeds the engineer's estimate filed under subsection (a).