Sec. 4.5. A carbon dioxide transmission pipeline company is not required to obtain a carbon dioxide transmission pipeline certificate of authority under section 4 of this chapter if either of the following applies: (1) The carbon dioxide transmission pipeline to be constructed and operated: (A) begins and ends on the surface property above the storage facility; and (B) does not cross: (i) public property; (ii) a public right-of-way; or (iii) a parcel for which the pipeline company would be required to obtain a right-of-way or easement for the pipeline. (2) The surface property above the storage facility crosses only one (1) or more of the following: (A) An existing private easement. (B) A private right-of-way.