Illinois Code § 210 ILCS 115/4

In order to obtain a permit to construct a new mobile home park
Open in Lexace · Ask the AI about this section
the applicant shall file with the Department a written application and plan
documents, including the following:

 
 
(a) The full name and address of the applicant or 
 
applicants, or names and addresses of the partners if the applicant is a partnership, or the names and addresses of the officers if the applicant is a corporation.

 
 
(b) The address, location and legal description of 
 
the tract of land upon which it is proposed to construct, operate and maintain a mobile home park.

 
 
(c) The name of the mobile home park.

 
 
(d) Detailed plans and specifications sealed by a 
 
registered engineer or architect licensed to practice in the State of Illinois which include a general plot plan of the mobile home park with all sites and structures shown, the water supply system, the sewage disposal system, the electrical system, the fuel supply system, the lighting system, the method of disposal of solid waste, all streets and sidewalks, swimming and bathing facilities, fire hydrants and details of all auxiliary structures.

 
 
(e) The number of mobile home sites proposed to be 
 
constructed or licensed.

 
 
(f) A statement of the fire-fighting facilities, 
 
public or private, which are available to the mobile home park.

 
 
(g) A plan review fee, which is nonrefundable. For 
 
permits filed prior to the effective date of this amendatory Act of the 101st General Assembly, the fee shall be $100. For permits filed on or after the effective date of this amendatory Act of the 101st General Assembly, the fee shall be $500. 

applicants, or names and addresses of the partners if the applicant is a partnership, or the names and addresses of the officers if the applicant is a corporation.
the tract of land upon which it is proposed to construct, operate and maintain a mobile home park.
registered engineer or architect licensed to practice in the State of Illinois which include a general plot plan of the mobile home park with all sites and structures shown, the water supply system, the sewage disposal system, the electrical system, the fuel supply system, the lighting system, the method of disposal of solid waste, all streets and sidewalks, swimming and bathing facilities, fire hydrants and details of all auxiliary structures.
constructed or licensed.
public or private, which are available to the mobile home park.
permits filed prior to the effective date of this amendatory Act of the 101st General Assembly, the fee shall be $100. For permits filed on or after the effective date of this amendatory Act of the 101st General Assembly, the fee shall be $500.

‹ Prev All Illinois sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.