Illinois Code § 20 ILCS 3855/1-75

Planning and Procurement Bureau.
Open in Lexace · Ask the AI about this section
(Text of Section before amendment by P.A. 104-458
)
 
Sec. 1-75. 
Planning and Procurement Bureau. 
The Planning and Procurement Bureau has the following duties and responsibilities:
 
(a) The Planning and Procurement Bureau shall each year, beginning in 2008, develop procurement plans and conduct competitive procurement processes in accordance with the requirements of Section 16-111.5 of the Public Utilities Act for the eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois. Beginning with the delivery year commencing on June 1, 2017, the Planning and Procurement Bureau shall develop plans and processes for the procurement of zero emission credits from zero emission facilities in accordance with the requirements of subsection (d-5) of this Section. Beginning on the effective date of this amendatory Act of the 102nd General Assembly, the Planning and Procurement Bureau shall develop plans and processes for the procurement of carbon mitigation credits from carbon-free energy resources in accordance with the requirements of subsection (d-10) of this Section. The Planning and Procurement Bureau shall also develop procurement plans and conduct competitive procurement processes in accordance with the requirements of Section 16-111.5 of the Public Utilities Act for the eligible retail customers of small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load. This Section shall not apply to a small multi-jurisdictional utility until such time as a small multi-jurisdictional utility requests the Agency to prepare a procurement plan for their Illinois jurisdictional load. For the purposes of this Section, the term "eligible retail customers" has the same definition as found in Section 16-111.5(a) of the Public Utilities Act.
 
Beginning with the plan or plans to be implemented in the 2017 delivery year, the Agency shall no longer include the procurement of renewable energy resources in the annual procurement plans required by this subsection (a), except as provided in subsection (q) of Section 16-111.5 of the Public Utilities Act, and shall instead develop a long-term renewable resources procurement plan in accordance with subsection (c) of this Section and Section 16-111.5 of the Public Utilities Act. 
 
In accordance with subsection (c-5) of this Section, the Planning and Procurement Bureau shall oversee the procurement by electric utilities that served more than 300,000 retail customers in this State as of January 1, 2019 of renewable energy credits from new utility-scale solar projects to be installed, along with energy storage facilities, at or adjacent to the sites of electric generating facilities that, as of January 1, 2016, burned coal as their primary fuel source. 
 
 
(1) The Agency shall each year, beginning in 2008, as 
 
needed, issue a request for qualifications for experts or expert consulting firms to develop the procurement plans in accordance with Section 16-111.5 of the Public Utilities Act. In order to qualify an expert or expert consulting firm must have:
 
 
 
(A) direct previous experience assembling 
 
 
large-scale power supply plans or portfolios for end-use customers;
 
 
 
(B) an advanced degree in economics, mathematics, 
 
 
engineering, risk management, or a related area of study;
 
 
 
(C) 10 years of experience in the electricity 
 
 
sector, including managing supply risk;
 
 
 
(D) expertise in wholesale electricity market 
 
 
rules, including those established by the Federal Energy Regulatory Commission and regional transmission organizations;
 
 
 
(E) expertise in credit protocols and familiarity 
 
 
with contract protocols;
 
 
 
(F) adequate resources to perform and fulfill the 
 
 
required functions and responsibilities; and
 
 
 
(G) the absence of a conflict of interest and 
 
 
inappropriate bias for or against potential bidders or the affected electric utilities.
 
 
(2) The Agency shall each year, as needed, issue a 
 
request for qualifications for a procurement administrator to conduct the competitive procurement processes in accordance with Section 16-111.5 of the Public Utilities Act. In order to qualify an expert or expert consulting firm must have:
 
 
 
(A) direct previous experience administering a 
 
 
large-scale competitive procurement process;
 
 
 
(B) an advanced degree in economics, mathematics, 
 
 
engineering, or a related area of study;
 
 
 
(C) 10 years of experience in the electricity 
 
 
sector, including risk management experience;
 
 
 
(D) expertise in wholesale electricity market 
 
 
rules, including those established by the Federal Energy Regulatory Commission and regional transmission organizations; 
 
 
 
(E) expertise in credit and contract protocols;
 
 
 
(F) adequate resources to perform and fulfill the 
 
 
required functions and responsibilities; and
 
 
 
(G) the absence of a conflict of interest and 
 
 
inappropriate bias for or against potential bidders or the affected electric utilities.
 
 
(3) The Agency shall provide affected utilities and 
 
other interested parties with the lists of qualified experts or expert consulting firms identified through the request for qualifications processes that are under consideration to develop the procurement plans and to serve as the procurement administrator. The Agency shall also provide each qualified expert's or expert consulting firm's response to the request for qualifications. All information provided under this subparagraph shall also be provided to the Commission. The Agency may provide by rule for fees associated with supplying the information to utilities and other interested parties. These parties shall, within 5 business days, notify the Agency in writing if they object to any experts or expert consulting firms on the lists. Objections shall be based on:
 
 
 
(A) failure to satisfy qualification criteria;
 
 
 
(B) identification of a conflict of interest; or
 
 
 
(C) evidence of inappropriate bias for or against 
 
 
potential bidders or the affected utilities.
 
 
The Agency shall remove experts or expert consulting 
 
firms from the lists within 10 days if there is a reasonable basis for an objection and provide the updated lists to the affected utilities and other interested parties. If the Agency fails to remove an expert or expert consulting firm from a list, an objecting party may seek review by the Commission within 5 days thereafter by filing a petition, and the Commission shall render a ruling on the petition within 10 days. There is no right of appeal of the Commission's ruling.
 
 
(4) The Agency shall issue requests for proposals to 
 
the qualified experts or expert consulting firms to develop a procurement plan for the affected utilities and to serve as procurement administrator.
 
 
(5) The Agency shall select an expert or expert 
 
consulting firm to develop procurement plans based on the proposals submitted and shall award contracts of up to 5 years to those selected.
 
 
(6) The Agency shall select an expert or expert 
 
consulting firm, with approval of the Commission, to serve as procurement administrator based on the proposals submitted. If the Commission rejects, within 5 days, the Agency's selection, the Agency shall submit another recommendation within 3 days based on the proposals submitted. The Agency shall award a 5-year contract to the expert or expert consulting firm so selected with Commission approval.
 
(b) The experts or expert consulting firms retained by the Agency shall, as appropriate, prepare procurement plans, and conduct a competitive procurement process as prescribed in Section 16-111.5 of the Public Utilities Act, to ensure adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability, for eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in the State of Illinois, and for eligible Illinois retail customers of small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load.
 
(c) Renewable portfolio standard.
 
 
(1)(A) The Agency shall develop a long-term renewable 
 
resources procurement plan that shall include procurement programs and competitive procurement events necessary to meet the goals set forth in this subsection (c). The initial long-term renewable resources procurement plan shall be released for comment no later than 160 days after June 1, 2017 (the effective date of Public Act 99-906). The Agency shall review, and may revise on an expedited basis, the long-term renewable resources procurement plan at least every 2 years, which shall be conducted in conjunction with the procurement plan under Section 16-111.5 of the Public Utilities Act to the extent practicable to minimize administrative expense. No later than 120 days after the effective date of this amendatory Act of the 103rd General Assembly, the Agency shall release for comment a revision to the long-term renewable resources procurement plan, updating elements of the most recently approved plan as needed to comply with this amendatory Act of the 103rd General Assembly, and any long-term renewable resources procurement plan update published by the Agency but not yet approved by the Illinois Commerce Commission shall be withdrawn. The long-term renewable resources procurement plans shall be subject to review and approval by the Commission under Section 16-111.5 of the Public Utilities Act.
 
 
(B) Subject to subparagraph (F) of this paragraph 
 
(1), the long-term renewable resources procurement plan shall attempt to meet the goals for procurement of renewable energy credits at levels of at least the following overall percentages: 13% by the 2017 delivery year; increasing by at least 1.5% each delivery year thereafter to at least 25% by the 2025 delivery year; increasing by at least 3% each delivery year thereafter to at least 40% by the 2030 delivery year, and continuing at no less than 40% for each delivery year thereafter. The Agency shall attempt to procure 50% by delivery year 2040. The Agency shall determine the annual increase between delivery year 2030 and delivery year 2040, if any, taking into account energy demand, other energy resources, and other public policy goals. In the event of a conflict between these goals and the new wind, new photovoltaic, and hydropower procurement requirements described in items (i) through (iii) of subparagraph (C) of this paragraph (1), the long-term plan shall prioritize compliance with the new wind, new photovoltaic, and hydropower procurement requirements described in items (i) through (iii) of subparagraph (C) of this paragraph (1) over the annual percentage targets described in this subparagraph (B). The Agency shall not comply with the annual percentage targets described in this subparagraph (B) by procuring renewable energy credits that are unlikely to lead to the development of new renewable resources or new, modernized, or retooled hydropower facilities. 
 
 
For the delivery year beginning June 1, 2017, the 
 
procurement plan shall attempt to include, subject to the prioritization outlined in this subparagraph (B), cost-effective renewable energy resources equal to at least 13% of each utility's load for eligible retail customers and 13% of the applicable portion of each utility's load for retail customers who are not eligible retail customers, which applicable portion shall equal 50% of the utility's load for retail customers who are not eligible retail customers on February 28, 2017. 
 
 
For the delivery year beginning June 1, 2018, the 
 
procurement plan shall attempt to include, subject to the prioritization outlined in this subparagraph (B), cost-effective renewable energy resources equal to at least 14.5% of each utility's load for eligible retail customers and 14.5% of the applicable portion of each utility's load for retail customers who are not eligible retail customers, which applicable portion shall equal 75% of the utility's load for retail customers who are not eligible retail customers on February 28, 2017. 
 
 
For the delivery year beginning June 1, 2019, and for 
 
each year thereafter, the procurement plans shall attempt to include, subject to the prioritization outlined in this subparagraph (B), cost-effective renewable energy resources equal to a minimum percentage of each utility's load for all retail customers as follows: 16% by June 1, 2019; increasing by 1.5% each year thereafter to 25% by June 1, 2025; and 25% by June 1, 2026; increasing by at least 3% each delivery year thereafter to at least 40% by the 2030 delivery year, and continuing at no less than 40% for each delivery year thereafter. The Agency shall attempt to procure 50% by delivery year 2040. The Agency shall determine the annual increase between delivery year 2030 and delivery year 2040, if any, taking into account energy demand, other energy resources, and other public policy goals. 
 
 
For each delivery year, the Agency shall first 
 
recognize each utility's obligations for that delivery year under existing contracts. Any renewable energy credits under existing contracts, including renewable energy credits as part of renewable energy resources, shall be used to meet the goals set forth in this subsection (c) for the delivery year. 
 
 
(C) The long-term renewable resources procurement 
 
plan described in subparagraph (A) of this paragraph (1) shall include the procurement of renewable energy credits from new projects pursuant to the following terms: 
 
 
 
(i) At least 10,000,000 renewable energy credits 
 
 
delivered annually by the end of the 2021 delivery year, and increasing ratably to reach 45,000,000 renewable energy credits delivered annually from new wind and solar projects, from repowered wind projects, or from retooled hydropower facilities by the end of delivery year 2030 such that the goals in subparagraph (B) of this paragraph (1) are met entirely by procurements of renewable energy credits from new wind and photovoltaic projects. Of that amount, to the extent possible, the Agency shall endeavor to procure 45% from new and repowered wind and hydropower projects and shall procure at least 55% from photovoltaic projects. Of the amount to be procured from photovoltaic projects, the Agency shall procure: at least 50% from solar photovoltaic projects using the program outlined in subparagraph (K) of this paragraph (1) from distributed renewable energy generation devices or community renewable generation projects; at least 47% from utility-scale solar projects; at least 3% from brownfield site photovoltaic projects that are not community renewable generation projects. The Agency may propose adjustments to these percentages, including establishing percentage-based goals for the procurement of renewable energy credits from modernized or retooled hydropower facilities and repowered wind projects, through its long-term renewable resources plan described in subparagraph (A) of this paragraph (1) as necessary based on developer interest, market conditions, budget considerations, resource adequacy needs, or other factors. 
 
 
 
In developing the long-term renewable resources 
 
 
procurement plan, the Agency shall consider other approaches, in addition to competitive procurements, that can be used to procure renewable energy credits from brownfield site photovoltaic projects and thereby help return blighted or contaminated land to productive use while enhancing public health and the well-being of Illinois residents, including those in environmental justice communities, as defined using existing methodologies and findings used by the Agency and its Administrator in its Illinois Solar for All Program. The Agency shall also consider other approaches, in addition to competitive procurements, to procure renewable energy credits from new and existing hydropower facilities to support the development and maintenance of these facilities. The Agency shall explore options to convert existing dams but shall not consider approaches to develop new dams where they do not already exist. To encourage the continued operation of utility-scale wind projects, the Agency shall consider and may propose other approaches in addition to competitive procurements to procure renewable energy credits from repowered wind projects. 
 
 
 
(ii) In any given delivery year, if forecasted 
 
 
expenses are less than the maximum budget available under subparagraph (E) of this paragraph (1), the Agency shall continue to procure new renewable energy credits until that budget is exhausted in the manner outlined in item (i) of this subparagraph (C).
 
 
 
(iii) For purposes of this Section:
 
 
 
"New wind projects" means wind renewable energy 
 
 
facilities that are energized after June 1, 2017 for the delivery year commencing June 1, 2017.
 
 
 
"New photovoltaic projects" means photovoltaic 
 
 
renewable energy facilities that are energized after June 1, 2017. Photovoltaic projects developed under Section 1-56 of this Act shall not apply towards the new photovoltaic project requirements in this subparagraph (C). 
 
 
 
"Repowered wind projects" means utility-scale 
 
 
wind projects featuring the removal, replacement, or expansion of turbines at an existing project site, as defined in the long-term renewable resources procurement plan, after the effective date of this amendatory Act of the 103rd General Assembly. Renewable energy credit contract awards used to support repowered wind projects shall only cover the incremental increase in facility electricity production resultant from repowering. 
 
 
 
For purposes of calculating whether the Agency 
 
 
has procured enough new wind and solar renewable energy credits required by this subparagraph (C), renewable energy facilities that have a multi-year renewable energy credit delivery contract with the utility through at least delivery year 2030 shall be considered new, however no renewable energy credits from contracts entered into before June 1, 2021 shall be used to calculate whether the Agency has procured the correct proportion of new wind and new solar contracts described in this subparagraph (C) for delivery year 2021 and thereafter. 
 
 
(D) Renewable energy credits shall be cost effective. 
 
For purposes of this subsection (c), "cost effective" means that the costs of procuring renewable energy resources do not cause the limit stated in subparagraph (E) of this paragraph (1) to be exceeded and, for renewable energy credits procured through a competitive procurement event, do not exceed benchmarks based on market prices for like products in the region. For purposes of this subsection (c), "like products" means contracts for renewable energy credits from the same or substantially similar technology, same or substantially similar vintage (new or existing), the same or substantially similar quantity, and the same or substantially similar contract length and structure. Benchmarks shall reflect development, financing, or related costs resulting from requirements imposed through other provisions of State law, including, but not limited to, requirements in subparagraphs (P) and (Q) of this paragraph (1) and the Renewable Energy Facilities Agricultural Impact Mitigation Act. Confidential benchmarks shall be developed by the procurement administrator, in consultation with the Commission staff, Agency staff, and the procurement monitor and shall be subject to Commission review and approval. If price benchmarks for like products in the region are not available, the procurement administrator shall establish price benchmarks based on publicly available data on regional technology costs and expected current and future regional energy prices. The benchmarks in this Section shall not be used to curtail or otherwise reduce contractual obligations entered into by or through the Agency prior to June 1, 2017 (the effective date of Public Act 99-906). 
 
 
(E) For purposes of this subsection (c), the required 
 
procurement of cost-effective renewable energy resources for a particular year commencing prior to June 1, 2017 shall be measured as a percentage of the actual amount of electricity (megawatt-hours) supplied by the electric utility to eligible retail customers in the delivery year ending immediately prior to the procurement, and, for delivery years commencing on and after June 1, 2017, the required procurement of cost-effective renewable energy resources for a particular year shall be measured as a percentage of the actual amount of electricity (megawatt-hours) delivered by the electric utility in the delivery year ending immediately prior to the procurement, to all retail customers in its service territory. For purposes of this subsection (c), the amount paid per kilowatthour means the total amount paid for electric service expressed on a per kilowatthour basis. For purposes of this subsection (c), the total amount paid for electric service includes without limitation amounts paid for supply, transmission, capacity, distribution, surcharges, and add-on taxes. 
 
 
Notwithstanding the requirements of this subsection 
 
(c), and except as provided in subparagraph (E-5) of paragraph (1) of this subsection (c), the total of renewable energy resources procured under the procurement plan for any single year shall be subject to the limitations of this subparagraph (E). Such procurement shall be reduced for all retail customers based on the amount necessary to limit the annual estimated average net increase due to the costs of these resources included in the amounts paid by eligible retail customers in connection with electric service to no more than 4.25% of the amount paid per kilowatthour by those customers during the year ending May 31, 2009. To arrive at a maximum dollar amount of renewable energy resources to be procured for the particular delivery year, the resulting per kilowatthour amount shall be applied to the actual amount of kilowatthours of electricity delivered, or applicable portion of such amount as specified in paragraph (1) of this subsection (c), as applicable, by the electric utility in the delivery year immediately prior to the procurement to all retail customers in its service territory. The calculations required by this subparagraph (E) shall be made only once for each delivery year at the time that the renewable energy resources are procured. Once the determination as to the amount of renewable energy resources to procure is made based on the calculations set forth in this subparagraph (E) and the contracts procuring those amounts are executed between the seller and applicable electric utility, no subsequent rate impact determinations shall be made and no adjustments to those contract amounts shall be allowed. As provided in subparagraph (E-5) of paragraph (1) of this subsection (c), the seller shall be entitled to full, prompt, and uninterrupted payment under the applicable contract notwithstanding the application of this subparagraph (E), and all costs incurred under such contracts shall be fully recoverable by the electric utility as provided in this Section. 
 
 
(E-5) If, for a particular delivery year, the 
 
limitation on the amount of renewable energy resources to be procured, as calculated pursuant to subparagraph (E) of paragraph (1) of this subsection (c), would result in an insufficient collection of funds to fully pay amounts due to a seller under existing contracts executed under this Section or executed under Section 1-56 of this Act, then the following provisions shall apply to ensure full and uninterrupted payment is made to such seller or sellers:
 
 
 
(i) If the electric utility has retained unspent 
 
 
funds in an interest-bearing account as prescribed in subsection (k) of Section 16-108 of the Public Utilities Act, then the utility shall use those funds to remit full payment to the sellers to ensure prompt and uninterrupted payment of existing contractual obligation.
 
 
 
(ii) If the funds described in item (i) of this 
 
 
subparagraph (E-5) are insufficient to satisfy all existing contractual obligations, then the electric utility shall, nonetheless, remit full payment to the sellers to ensure prompt and uninterrupted payment of existing contractual obligations, provided that the full costs shall be recoverable by the utility in accordance with part (ee) of item (iv) of this subsection (E-5).
 
 
 
(iii) The Agency shall promptly notify the 
 
 
Commission that existing contractual obligations are reasonably expected to exceed the maximum collection authorized under subparagraph (E) of paragraph (1) of this subsection (c) for the applicable delivery year. The Agency shall also explain and confirm how the operation of items (i) and (ii) of this subparagraph (E-5) ensures that the electric utility will continue to make prompt and uninterrupted payment under existing contractual obligations. The Agency shall provide this information to the Commission through a notice filed in the Commission docket approving the Agency's operative Long-Term Renewable Resources Procurement Plan that includes the applicable delivery year.
 
 
 
(iv) The Agency shall suspend or reduce new 
 
 
contract awards for the procurement of renewable energy credits until an Agency determination is made under subparagraph (E) that additional procurements would not cause the rate impact limitation of subparagraph (E) to be exceeded. At least once annually after the notice provided for in item (iii) of this subparagraph (E-5) is made, the Agency shall analyze existing contract obligations, projected prices for indexed renewable energy credit contracts executed under item (v) of subparagraph (G) of paragraph (1) of subsection (c) of Section 1-75 of this Act, and expected collections authorized under subparagraph (E) to determine whether and to what extent the limitations of subparagraph (E) would be exceeded by additional renewable energy credit procurement contract awards.
 
 
 
 
(aa) If the Agency determines that additional 
 
 
 
renewable energy credit procurement contract awards could be made without exceeding the limitations of subparagraph (E), then the procurements shall be authorized at a scale determined not to exceed the limitations of subparagraph (E) in a manner consistent with the priorities of this Section.
 
 
 
 
(bb) If the Agency determines that additional 
 
 
 
renewable energy credit procurement contract awards cannot be made without exceeding the limitations of subparagraph (E), then the Agency shall suspend any new contract awards for the procurement of renewable energy credits until a new rate impact determination is made under subparagraph (E).
 
 
 
 
(cc) Agency determinations made under this 
 
 
 
item (iv) shall be detailed and comprehensive and, if not made through the Agency's Long-Term Renewable Resources Procurement Plan, shall be filed as a compliance filing in the most recent docketed proceeding approving the Agency's Long-Term Renewable Resources Procurement Plan.
 
 
 
 
(dd) With respect to the procurement of 
 
 
 
renewable energy credits authorized through programs administered under subsection (b) of Section 1-56 and subparagraphs (K) through (M) of paragraph (1) of subsection (k) of Section 1-75 of this Act, the award of contracts for the procurement of renewable energy credits shall be suspended or reduced only at the conclusion of the program year in which the notice provided for under item (iii) of this subparagraph (E-5) is made. 
 
 
 
 
(ee) The contract shall provide that, so long 
 
 
 
as at least one of: (i) the cost recovery mechanisms referenced in subsection (k) of Section 16-108 and subsection (l) of Section 16-111.5 of the Public Utilities Act remains in full force without limitation or (ii) the utility is otherwise authorized and or entitled to full, prompt, and uninterrupted recovery of its costs through any other mechanism, then such seller shall be entitled to full, prompt, and uninterrupted payment under the applicable contract notwithstanding the application of this subparagraph (E). 
 
 
(F) If the limitation on the amount of renewable 
 
energy resources procured in subparagraph (E) of this paragraph (1) prevents the Agency from meeting all of the goals in this subsection (c), the Agency's long-term plan shall prioritize compliance with the requirements of this subsection (c) regarding renewable energy credits in the following order:
 
 
 
(i) renewable energy credits under existing 
 
 
contractual obligations as of June 1, 2021;
 
 
 
(i-5) funding for the Illinois Solar for All 
 
 
Program, as described in subparagraph (O) of this paragraph (1); 
 
 
 
(ii) renewable energy credits necessary to comply 
 
 
with the new wind and new photovoltaic procurement requirements described in items (i) through (iii) of subparagraph (C) of this paragraph (1); and
 
 
 
(iii) renewable energy credits necessary to meet 
 
 
the remaining requirements of this subsection (c).
 
 
(G) The following provisions shall apply to the 
 
Agency's procurement of renewable energy credits under this subsection (c):
 
 
 
(i) Notwithstanding whether a long-term renewable 
 
 
resources procurement plan has been approved, the Agency shall conduct an initial forward procurement for renewable energy credits from new utility-scale wind projects within 160 days after June 1, 2017 (the effective date of Public Act 99-906). For the purposes of this initial forward procurement, the Agency shall solicit 15-year contracts for delivery of 1,000,000 renewable energy credits delivered annually from new utility-scale wind projects to begin delivery on June 1, 2019, if available, but not later than June 1, 2021, unless the project has delays in the establishment of an operating interconnection with the applicable transmission or distribution system as a result of the actions or inactions of the transmission or distribution provider, or other causes for force majeure as outlined in the procurement contract, in which case, not later than June 1, 2022. Payments to suppliers of renewable energy credits shall commence upon delivery. Renewable energy credits procured under this initial procurement shall be included in the Agency's long-term plan and shall apply to all renewable energy goals in this subsection (c).
 
 
 
(ii) Notwithstanding whether a long-term 
 
 
renewable resources procurement plan has been approved, the Agency shall conduct an initial forward procurement for renewable energy credits from new utility-scale solar projects and brownfield site photovoltaic projects within one year after June 1, 2017 (the effective date of Public Act 99-906). For the purposes of this initial forward procurement, the Agency shall solicit 15-year contracts for delivery of 1,000,000 renewable energy credits delivered annually from new utility-scale solar projects and brownfield site photovoltaic projects to begin delivery on June 1, 2019, if available, but not later than June 1, 2021, unless the project has delays in the establishment of an operating interconnection with the applicable transmission or distribution system as a result of the actions or inactions of the transmission or distribution provider, or other causes for force majeure as outlined in the procurement contract, in which case, not later than June 1, 2022. The Agency may structure this initial procurement in one or more discrete procurement events. Payments to suppliers of renewable energy credits shall commence upon delivery. Renewable energy credits procured under this initial procurement shall be included in the Agency's long-term plan and shall apply to all renewable energy goals in this subsection (c).
 
 
 
(iii) Notwithstanding whether the Commission has 
 
 
approved the periodic long-term renewable resources procurement plan revision described in Section 16-111.5 of the Public Utilities Act, the Agency shall conduct at least one subsequent forward procurement for renewable energy credits from new utility-scale wind projects, new utility-scale solar projects, and new brownfield site photovoltaic projects within 240 days after the effective date of this amendatory Act of the 102nd General Assembly in quantities necessary to meet the requirements of subparagraph (C) of this paragraph (1) through the delivery year beginning June 1, 2021.
 
 
 
(iv) Notwithstanding whether the Commission has 
 
 
approved the periodic long-term renewable resources procurement plan revision described in Section 16-111.5 of the Public Utilities Act, the Agency shall open capacity for each category in the Adjustable Block program within 90 days after the effective date of this amendatory Act of the 102nd General Assembly manner:
 
 
 
 
(1) The Agency shall open the first block of 
 
 
 
annual capacity for the category described in item (i) of subparagraph (K) of this paragraph (1). The first block of annual capacity for item (i) shall be for at least 75 megawatts of total nameplate capacity. The price of the renewable energy credit for this block of capacity shall be 4% less than the price of the last open block in this category. Projects on a waitlist shall be awarded contracts first in the order in which they appear on the waitlist. Notwithstanding anything to the contrary, for those renewable energy credits that qualify and are procured under this subitem (1) of this item (iv), the renewable energy credit delivery contract value shall be paid in full, based on the estimated generation during the first 15 years of operation, by the contracting utilities at the time that the facility producing the renewable energy credits is interconnected at the distribution system level of the utility and verified as energized and in compliance by the Program Administrator. The electric utility shall receive and retire all renewable energy credits generated by the project for the first 15 years of operation. Renewable energy credits generated by the project thereafter shall not be transferred under the renewable energy credit delivery contract with the counterparty electric utility.
 
 
 
 
(2) The Agency shall open the first block of 
 
 
 
annual capacity for the category described in item (ii) of subparagraph (K) of this paragraph (1). The first block of annual capacity for item (ii) shall be for at least 75 megawatts of total nameplate capacity.
 
 
 
 
 
(A) The price of the renewable energy 
 
 
 
 
credit for any project on a waitlist for this category before the opening of this block shall be 4% less than the price of the last open block in this category. Projects on the waitlist shall be awarded contracts first in the order in which they appear on the waitlist. Any projects that are less than or equal to 25 kilowatts in size on the waitlist for this capacity shall be moved to the waitlist for paragraph (1) of this item (iv). Notwithstanding anything to the contrary, projects that were on the waitlist prior to opening of this block shall not be required to be in compliance with the requirements of subparagraph (Q) of this paragraph (1) of this subsection (c). Notwithstanding anything to the contrary, for those renewable energy credits procured from projects that were on the waitlist for this category before the opening of this block 20% of the renewable energy credit delivery contract value, based on the estimated generation during the first 15 years of operation, shall be paid by the contracting utilities at the time that the facility producing the renewable energy credits is interconnected at the distribution system level of the utility and verified as energized by the Program Administrator. The remaining portion shall be paid ratably over the subsequent 4-year period. The electric utility shall receive and retire all renewable energy credits generated by the project during the first 15 years of operation. Renewable energy credits generated by the project thereafter shall not be transferred under the renewable energy credit delivery contract with the counterparty electric utility.
 
 
 
 
 
(B) The price of renewable energy credits 
 
 
 
 
for any project not on the waitlist for this category before the opening of the block shall be determined and published by the Agency. Projects not on a waitlist as of the opening of this block shall be subject to the requirements of subparagraph (Q) of this paragraph (1), as applicable. Projects not on a waitlist as of the opening of this block shall be subject to the contract provisions outlined in item (iii) of subparagraph (L) of this paragraph (1). The Agency shall strive to publish updated prices and an updated renewable energy credit delivery contract as quickly as possible. 
 
 
 
 
(3) For opening the first 2 blocks of annual 
 
 
 
capacity for projects participating in item (iii) of subparagraph (K) of paragraph (1) of subsection (c), projects shall be selected exclusively from those projects on the ordinal waitlists of community renewable generation projects established by the Agency based on the status of those ordinal waitlists as of December 31, 2020, and only those projects previously determined to be eligible for the Agency's April 2019 community solar project selection process.
 
 
 
 
The first 2 blocks of annual capacity for 
 
 
 
item (iii) shall be for 250 megawatts of total nameplate capacity, with both blocks opening simultaneously under the schedule outlined in the paragraphs below. Projects shall be selected as follows:
 
 
 
 
 
(A) The geographic balance of selected 
 
 
 
 
projects shall follow the Group classification found in the Agency's Revised Long-Term Renewable Resources Procurement Plan, with 70% of capacity allocated to projects on the Group B waitlist and 30% of capacity allocated to projects on the Group A waitlist.
 
 
 
 
 
(B) Contract awards for waitlisted 
 
 
 
 
projects shall be allocated proportionate to the total nameplate capacity amount across both ordinal waitlists associated with that applicant firm or its affiliates, subject to the following conditions.
 
 
 
 
 
 
(i) Each applicant firm having a 
 
 
 
 
 
waitlisted project eligible for selection shall receive no less than 500 kilowatts in awarded capacity across all groups, and no approved vendor may receive more than 20% of each Group's waitlist allocation.
 
 
 
 
 
 
(ii) Each applicant firm, upon 
 
 
 
 
 
receiving an award of program capacity proportionate to its waitlisted capacity, may then determine which waitlisted projects it chooses to be selected for a contract award up to that capacity amount.
 
 
 
 
 
 
(iii) Assuming all other program 
 
 
 
 
 
requirements are met, applicant firms may adjust the nameplate capacity of applicant projects without losing waitlist eligibility, so long as no project is greater than 2,000 kilowatts in size.
 
 
 
 
 
 
(iv) Assuming all other program 
 
 
 
 
 
requirements are met, applicant firms may adjust the expected production associated with applicant projects, subject to verification by the Program Administrator.
 
 
 
 
 
(C) After a review of affiliate 
 
 
 
 
information and the current ordinal waitlists, the Agency shall announce the nameplate capacity award amounts associated with applicant firms no later than 90 days after the effective date of this amendatory Act of the 102nd General Assembly.
 
 
 
 
 
(D) Applicant firms shall submit their 
 
 
 
 
portfolio of projects used to satisfy those contract awards no less than 90 days after the Agency's announcement. The total nameplate capacity of all projects used to satisfy that portfolio shall be no greater than the Agency's nameplate capacity award amount associated with that applicant firm. An applicant firm may decline, in whole or in part, its nameplate capacity award without penalty, with such unmet capacity rolled over to the next block opening for project selection under item (iii) of subparagraph (K) of this subsection (c). Any projects not included in an applicant firm's portfolio may reapply without prejudice upon the next block reopening for project selection under item (iii) of subparagraph (K) of this subsection (c).
 
 
 
 
 
(E) The renewable energy credit delivery 
 
 
 
 
contract shall be subject to the contract and payment terms outlined in item (iv) of subparagraph (L) of this subsection (c). Contract instruments used for this subparagraph shall contain the following terms:
 
 
 
 
 
 
(i) Renewable energy credit prices 
 
 
 
 
 
shall be fixed, without further adjustment under any other provision of this Act or for any other reason, at 10% lower than prices applicable to the last open block for this category, inclusive of any adders available for achieving a minimum of 50% of subscribers to the project's nameplate capacity being residential or small commercial customers with subscriptions of below 25 kilowatts in size;
 
 
 
 
 
 
(ii) A requirement that a minimum of 
 
 
 
 
 
50% of subscribers to the project's nameplate capacity be residential or small commercial customers with subscriptions of below 25 kilowatts in size;
 
 
 
 
 
 
(iii) Permission for the ability of a 
 
 
 
 
 
contract holder to substitute projects with other waitlisted projects without penalty should a project receive a non-binding estimate of costs to construct the interconnection facilities and any required distribution upgrades associated with that project of greater than 30 cents per watt AC of that project's nameplate capacity. In developing the applicable contract instrument, the Agency may consider whether other circumstances outside of the control of the applicant firm should also warrant project substitution rights.
 
 
 
 
 
The Agency shall publish a finalized 
 
 
 
 
updated renewable energy credit delivery contract developed consistent with these terms and conditions no less than 30 days before applicant firms must submit their portfolio of projects pursuant to item (D).
 
 
 
 
 
(F) To be eligible for an award, the 
 
 
 
 
applicant firm shall certify that not less than prevailing wage, as determined pursuant to the Illinois Prevailing Wage Act, was or will be paid to employees who are engaged in construction activities associated with a selected project.
 
 
 
 
(4) The Agency shall open the first block of 
 
 
 
annual capacity for the category described in item (iv) of subparagraph (K) of this paragraph (1). The first block of annual capacity for item (iv) shall be for at least 50 megawatts of total nameplate capacity. Renewable energy credit prices shall be fixed, without further adjustment under any other provision of this Act or for any other reason, at the price in the last open block in the category described in item (ii) of subparagraph (K) of this paragraph (1). Pricing for future blocks of annual capacity for this category may be adjusted in the Agency's second revision to its Long-Term Renewable Resources Procurement Plan. Projects in this category shall be subject to the contract terms outlined in item (iv) of subparagraph (L) of this paragraph (1).
 
 
 
 
(5) The Agency shall open the equivalent of 2 
 
 
 
years of annual capacity for the category described in item (v) of subparagraph (K) of this paragraph (1). The first block of annual capacity for item (v) shall be for at least 10 megawatts of total nameplate capacity. Notwithstanding the provisions of item (v) of subparagraph (K) of this paragraph (1), for the purpose of this initial block, the agency shall accept new project applications intended to increase the diversity of areas hosting community solar projects, the business models of projects, and the size of projects, as described by the Agency in its long-term renewable resources procurement plan that is approved as of the effective date of this amendatory Act of the 102nd General Assembly. Projects in this category shall be subject to the contract terms outlined in item (iii) of subsection (L) of this paragraph (1).
 
 
 
 
(6) The Agency shall open the first blocks of 
 
 
 
annual capacity for the category described in item (vi) of subparagraph (K) of this paragraph (1), with allocations of capacity within the block generally matching the historical share of block capacity allocated between the category described in items (i) and (ii) of subparagraph (K) of this paragraph (1). The first two blocks of annual capacity for item (vi) shall be for at least 75 megawatts of total nameplate capacity. The price of renewable energy credits for the blocks of capacity shall be 4% less than the price of the last open blocks in the categories described in items (i) and (ii) of subparagraph (K) of this paragraph (1). Pricing for future blocks of annual capacity for this category may be adjusted in the Agency's second revision to its Long-Term Renewable Resources Procurement Plan. Projects in this category shall be subject to the applicable contract terms outlined in items (ii) and (iii) of subparagraph (L) of this paragraph (1).
 
 
 
(v) Upon the effective date of this amendatory 
 
 
Act of the 102nd General Assembly, for all competitive procurements and any procurements of renewable energy credit from new utility-scale wind and new utility-scale photovoltaic projects, the Agency shall procure indexed renewable energy credits and direct respondents to offer a strike price.
 
 
 
 
(1) The purchase price of the indexed 
 
 
 
renewable energy credit payment shall be calculated for each settlement period. That payment, for any settlement period, shall be equal to the difference resulting from subtracting the strike price from the index price for that settlement period. If this difference results in a negative number, the indexed REC counterparty shall owe the seller the absolute value multiplied by the quantity of energy produced in the relevant settlement period. If this difference results in a positive number, the seller shall owe the indexed REC counterparty this amount multiplied by the quantity of energy produced in the relevant settlement period.
 
 
 
 
(2) Parties shall cash settle every month, 
 
 
 
summing up all settlements (both positive and negative, if applicable) for the prior month.
 
 
 
 
(3) To ensure funding in the annual budget 
 
 
 
established under subparagraph (E) for indexed renewable energy credit procurements for each year of the term of such contracts, which must have a minimum tenure of 20 calendar years, the procurement administrator, Agency, Commission staff, and procurement monitor shall quantify the annual cost of the contract by utilizing an industry-standard, third-party forward price curve for energy at the appropriate hub or load zone, including the estimated magnitude and timing of the price effects related to federal carbon controls. Each forward price curve shall contain a specific value of the forecasted market price of electricity for each annual delivery year of the contract. For procurement planning purposes, the impact on the annual budget for the cost of indexed renewable energy credits for each delivery year shall be determined as the expected annual contract expenditure for that year, equaling the difference between (i) the sum across all relevant contracts of the applicable strike price multiplied by contract quantity and (ii) the sum across all relevant contracts of the forward price curve for the applicable load zone for that year multiplied by contract quantity. The contracting utility shall not assume an obligation in excess of the estimated annual cost of the contracts for indexed renewable energy credits. Forward curves shall be revised on an annual basis as updated forward price curves are released and filed with the Commission in the proceeding approving the Agency's most recent long-term renewable resources procurement plan. If the expected contract spend is higher or lower than the total quantity of contracts multiplied by the forward price curve value for that year, the forward price curve shall be updated by the procurement administrator, in consultation with the Agency, Commission staff, and procurement monitors, using then-currently available price forecast data and additional budget dollars shall be obligated or reobligated as appropriate.
 
 
 
 
(4) To ensure that indexed renewable energy 
 
 
 
credit prices remain predictable and affordable, the Agency may consider the institution of a price collar on REC prices paid under indexed renewable energy credit procurements establishing floor and ceiling REC prices applicable to indexed REC contract prices. Any price collars applicable to indexed REC procurements shall be proposed by the Agency through its long-term renewable resources procurement plan. 
 
 
 
(vi) All procurements under this subparagraph 
 
 
(G), including the procurement of renewable energy credits from hydropower facilities, shall comply with the geographic requirements in subparagraph (I) of this paragraph (1) and shall follow the procurement processes and procedures described in this Section and Section 16-111.5 of the Public Utilities Act to the extent practicable, and these processes and procedures may be expedited to accommodate the schedule established by this subparagraph (G).
 
 
 
(vii) On and after the effective date of this 
 
 
amendatory Act of the 103rd General Assembly, for all procurements of renewable energy credits from hydropower facilities, the Agency shall establish contract terms designed to optimize existing hydropower facilities through modernization or retooling and establish new hydropower facilities at existing dams. Procurements made under this item (vii) shall prioritize projects located in designated environmental justice communities, as defined in subsection (b) of Section 1-56 of this Act, or in projects located in units of local government with median incomes that do not exceed 82% of the median income of the State. 
 
 
(H) The procurement of renewable energy resources for 
 
a given delivery year shall be reduced as described in this subparagraph (H) if an alternative retail electric supplier meets the requirements described in this subparagraph (H). 
 
 
 
(i) Within 45 days after June 1, 2017 (the 
 
 
effective date of Public Act 99-906), an alternative retail electric supplier or its successor shall submit an informational filing to the Illinois Commerce Commission certifying that, as of December 31, 2015, the alternative retail electric supplier owned one or more electric generating facilities that generates renewable energy resources as defined in Section 1-10 of this Act, provided that such facilities are not powered by wind or photovoltaics, and the facilities generate one renewable energy credit for each megawatthour of energy produced from the facility.
 
 
 
The informational filing shall identify each 
 
 
facility that was eligible to satisfy the alternative retail electric supplier's obligations under Section 16-115D of the Public Utilities Act as described in this item (i).
 
 
 
(ii) For a given delivery year, the alternative 
 
 
retail electric supplier may elect to supply its retail customers with renewable energy credits from the facility or facilities described in item (i) of this subparagraph (H) that continue to be owned by the alternative retail electric supplier.
 
 
 
(iii) The alternative retail electric supplier 
 
 
shall notify the Agency and the applicable utility, no later than February 28 of the year preceding the applicable delivery year or 15 days after June 1, 2017 (the effective date of Public Act 99-906), whichever is later, of its election under item (ii) of this subparagraph (H) to supply renewable energy credits to retail customers of the utility. Such election shall identify the amount of renewable energy credits to be supplied by the alternative retail electric supplier to the utility's retail customers and the source of the renewable energy credits identified in the informational filing as described in item (i) of this subparagraph (H), subject to the following limitations:
 
 
 
 
For the delivery year beginning June 1, 2018, 
 
 
 
the maximum amount of renewable energy credits to be supplied by an alternative retail electric supplier under this subparagraph (H) shall be 68% multiplied by 25% multiplied by 14.5% multiplied by the amount of metered electricity (megawatt-hours) delivered by the alternative retail electric supplier to Illinois retail customers during the delivery year ending May 31, 2016.
 
 
 
 
For delivery years beginning June 1, 2019 and 
 
 
 
each year thereafter, the maximum amount of renewable energy credits to be supplied by an alternative retail electric supplier under this subparagraph (H) shall be 68% multiplied by 50% multiplied by 16% multiplied by the amount of metered electricity (megawatt-hours) delivered by the alternative retail electric supplier to Illinois retail customers during the delivery year ending May 31, 2016, provided that the 16% value shall increase by 1.5% each delivery year thereafter to 25% by the delivery year beginning June 1, 2025, and thereafter the 25% value shall apply to each delivery year.
 
 
 
For each delivery year, the total amount of 
 
 
renewable energy credits supplied by all alternative retail electric suppliers under this subparagraph (H) shall not exceed 9% of the Illinois target renewable energy credit quantity. The Illinois target renewable energy credit quantity for the delivery year beginning June 1, 2018 is 14.5% multiplied by the total amount of metered electricity (megawatt-hours) delivered in the delivery year immediately preceding that delivery year, provided that the 14.5% shall increase by 1.5% each delivery year thereafter to 25% by the delivery year beginning June 1, 2025, and thereafter the 25% value shall apply to each delivery year.
 
 
 
If the requirements set forth in items (i) 
 
 
through (iii) of this subparagraph (H) are met, the charges that would otherwise be applicable to the retail customers of the alternative retail electric supplier under paragraph (6) of this subsection (c) for the applicable delivery year shall be reduced by the ratio of the quantity of renewable energy credits supplied by the alternative retail electric supplier compared to that supplier's target renewable energy credit quantity. The supplier's target renewable energy credit quantity for the delivery year beginning June 1, 2018 is 14.5% multiplied by the total amount of metered electricity (megawatt-hours) delivered by the alternative retail supplier in that delivery year, provided that the 14.5% shall increase by 1.5% each delivery year thereafter to 25% by the delivery year beginning June 1, 2025, and thereafter the 25% value shall apply to each delivery year. 
 
 
 
On or before April 1 of each year, the Agency 
 
 
shall annually publish a report on its website that identifies the aggregate amount of renewable energy credits supplied by alternative retail electric suppliers under this subparagraph (H). 
 
 
(I) The Agency shall design its long-term renewable 
 
energy procurement plan to maximize the State's interest in the health, safety, and welfare of its residents, including but not limited to minimizing sulfur dioxide, nitrogen oxide, particulate matter and other pollution that adversely affects public health in this State, increasing fuel and resource diversity in this State, enhancing the reliability and resiliency of the electricity distribution system in this State, meeting goals to limit carbon dioxide emissions under federal or State law, and contributing to a cleaner and healthier environment for the citizens of this State. In order to further these legislative purposes, renewable energy credits shall be eligible to be counted toward the renewable energy requirements of this subsection (c) if they are generated from facilities located in this State. The Agency may qualify renewable energy credits from facilities located in states adjacent to Illinois or renewable energy credits associated with the electricity generated by a utility-scale wind energy facility or utility-scale photovoltaic facility and transmitted by a qualifying direct current project described in subsection (b-5) of Section 8-406 of the Public Utilities Act to a delivery point on the electric transmission grid located in this State or a state adjacent to Illinois, if the generator demonstrates and the Agency determines that the operation of such facility or facilities will help promote the State's interest in the health, safety, and welfare of its residents based on the public interest criteria described above. For the purposes of this Section, renewable resources that are delivered via a high voltage direct current converter station located in Illinois shall be deemed generated in Illinois at the time and location the energy is converted to alternating current by the high voltage direct current converter station if the high voltage direct current transmission line: (i) after the effective date of this amendatory Act of the 102nd General Assembly, was constructed with a project labor agreement; (ii) is capable of transmitting electricity at 525kv; (iii) has an Illinois converter station located and interconnected in the region of the PJM Interconnection, LLC; (iv) does not operate as a public utility; and (v) if the high voltage direct current transmission line was energized after June 1, 2023. To ensure that the public interest criteria are applied to the procurement and given full effect, the Agency's long-term procurement plan shall describe in detail how each public interest factor shall be considered and weighted for facilities located in states adjacent to Illinois.
 
 
(J) In order to promote the competitive development 
 
of renewable energy resources in furtherance of the State's interest in the health, safety, and welfare of its residents, renewable energy credits shall not be eligible to be counted toward the renewable energy requirements of this subsection (c) if they are sourced from a generating unit whose costs were being recovered through rates regulated by this State or any other state or states on or after January 1, 2017. Each contract executed to purchase renewable energy credits under this subsection (c) shall provide for the contract's termination if the costs of the generating unit supplying the renewable energy credits subsequently begin to be recovered through rates regulated by this State or any other state or states; and each contract shall further provide that, in that event, the supplier of the credits must return 110% of all payments received under the contract. Amounts returned under the requirements of this subparagraph (J) shall be retained by the utility and all of these amounts shall be used for the procurement of additional renewable energy credits from new wind or new photovoltaic resources as defined in this subsection (c). The long-term plan shall provide that these renewable energy credits shall be procured in the next procurement event.
 
 
Notwithstanding the limitations of this subparagraph 
 
(J), renewable energy credits sourced from generating units that are constructed, purchased, owned, or leased by an electric utility as part of an approved project, program, or pilot under Section 1-56 of this Act shall be eligible to be counted toward the renewable energy requirements of this subsection (c), regardless of how the costs of these units are recovered. As long as a generating unit or an identifiable portion of a generating unit has not had and does not have its costs reco

Excerpt shown. Open the full section in Lexace.

‹ Prev All Illinois sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.