Connecticut Code § 29-193

(Formerly Sec. 19-412). Approval of plans; fee
Open in Lexace · Ask the AI about this section
No new elevator or escalator shall be erected or installed and no elevator or escalator shall be relocated or altered until detailed plans and specifications of the proposed construction or other work have been submitted in triplicate to the department for approval. A fee of two hundred fifty dollars for each elevator or escalator payable to the department shall accompany each such proposal. Notice that such plans are approved or disapproved shall be given within a reasonable time and final inspection of the elevator or escalator, when installed, relocated or altered, shall be made before final approval for operation is given by the department. The department may issue a temporary operating permit, if necessary, pending final inspection and approval. The provisions of this chapter shall not prevent the operation of any elevator installed for temporary use in connection with building operations or the operation of any elevator for purposes connected with the installation or the testing of the same.

‹ Prev All Connecticut sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.