Colorado Code § 34-60-116

Drilling units - pooling interests - definition
Open in Lexace · Ask the AI about this section
(1) (a) To prevent or to assist
in preventing waste, to avoid the drilling of unnecessary wells, or to protect correlative rights,
the commission, upon its own motion or on a proper application of an interested party, but after
notice and hearing as provided in this section, may establish one or more drilling units of
specified size and shape covering any pool or portion of a pool.
(b) The application must include proof that either:
(I) The applicant has filed an application with the local government having jurisdiction
to approve the siting of the proposed oil and gas location and the local government's disposition
of the application; or
(II) The local government having jurisdiction does not regulate the siting of oil and gas
locations.
(2) In establishing a drilling unit, the acreage to be embraced within each unit and the
shape thereof shall be determined by the commission from the evidence introduced at the
hearing; except that, when found to be necessary for any of the purposes mentioned in subsection
(1) of this section, the commission is authorized to divide any pool into zones and establish
drilling units for each zone, which units may differ in size and shape from those established in
any other zone, so that the pool as a whole will be efficiently and economically developed, but
no drilling unit shall be smaller than the maximum area that can be efficiently and economically
drained by one well. If the commission is unable to determine, based on the evidence introduced
at the hearing, the existence of a pool and the appropriate acreage to be embraced within a
drilling unit and the shape thereof, the commission is authorized to establish exploratory drilling
units for the purpose of obtaining evidence as to the existence of a pool and the appropriate size
and shape of the drilling unit to be applied thereto. In establishing the size and shape of the
exploratory drilling unit, the commission may consider, but is not limited to, the size and shape
of drilling units previously established by the commission for the same formation in other areas
of the same geologic basin. Any spacing regulation made by the commission shall apply to each
individual pool separately and not to all units on a statewide basis.
(3) The order establishing a drilling unit:
(a) Is subject to section 34-60-106 (2.5); and
(b) May authorize one or more wells to be drilled and produced from the common source
of supply on a drilling unit.
(4) The commission, upon application, notice, and hearing, may decrease or increase the
size of the drilling units or permit additional wells to be drilled within the established units in
order to prevent or assist in preventing waste or to avoid the drilling of unnecessary wells, or to
protect correlative rights, and the commission may enlarge the area covered by the order fixing
drilling units, if the commission determines that the common source of supply underlies an area
not covered by the order.
(5) After an order fixing drilling units has been entered by the commission, the
commencement of drilling of any well into any common source of supply for the purpose of
producing oil or gas therefrom, at a location other than authorized by the order, is prohibited.
The operation of any well drilled in violation of an order fixing drilling units is prohibited.
(6) (a) When two or more separately owned tracts are embraced within a drilling unit, or
when there are separately owned interests in all or a part of the drilling unit, then persons owning
the interests may pool their interests for the development and operation of the drilling unit.
(b) (I) In the absence of voluntary pooling, the commission, upon the application of a
person that owns, or has secured the consent of the owners of, more than forty-five percent of the
mineral interests to be pooled, may enter an order pooling all interests in the drilling unit for the
development and operation of the drilling unit. The application must include an affidavit that
declares that the applicant owns, or has secured the consent of the owners of, more than forty-
five percent of the mineral interests to be pooled. The affidavit must identify:
(A) By recording or reception number, any recorded oil and gas lease, recorded
memorandum of oil and gas lease, or recorded agreement that conveys rights to minerals or
provides the consent of an applicable mineral interest owner or owners within the drilling unit
and that the applicant is using to support the declaration in the affidavit; and
(B) The American Petroleum Institute unique identifier number assigned by the
commission for any oil and gas well that is holding open a recorded oil and gas lease, recorded
memorandum of oil and gas lease, or recorded agreement identified pursuant to subsection
(6)(b)(I)(A) of this section.
(I.3) If the applicant is relying on an unrecorded oil and gas lease, unrecorded
memorandum of oil and gas lease, or unrecorded agreement to support the declaration in the
affidavit, the applicant must disclose that the applicant is relying on an unrecorded oil and gas
lease, unrecorded memorandum of oil and gas lease, or unrecorded agreement in the affidavit.
(I.5) If a protest is filed pursuant to subsection (6)(b.5)(I) of this section, the commission
shall require the applicant to provide information about the unrecorded oil and gas lease,
unrecorded memorandum of oil and gas lease, or unrecorded agreement in accordance with
subsection (6)(b.5)(III) of this section and the commission's applicable confidentiality
procedures.
(I.7) Mineral interests that are owned by a person that cannot be located through
reasonable diligence are excluded from the calculation described in subsection (6)(b)(I) of this
section.
(II) The pooling order must be made after notice and a hearing and must be upon terms
and conditions that are just and reasonable and that afford to the owner of each tract or interest in
the drilling unit the opportunity to recover or receive, without unnecessary expense, a just and
equitable share.
(b.5) (I) At least sixty days before the first hearing date for which the commission has
provided notice, an unleased mineral interest owner of mineral interests proposed to be pooled
by an application may file a protest of the application with the commission disputing the
declaration in the affidavit provided by the applicant pursuant to subsection (6)(b)(I) of this
section.
(II) The commission shall resolve an unleased mineral interest owner's bona fide protest
to an application disputing the declaration in the affidavit provided by the applicant pursuant to
subsection (6)(b)(I) of this section prior to entering a pooling order. The resolution process must
protect the interests of an unleased mineral interest owner that has articulated a bona fide factual
dispute concerning the declaration in the affidavit provided by the applicant pursuant to
subsection (6)(b)(I) of this section and may include a stay of the application pending a
determination made by a court.
(III) The commission shall allow an unleased mineral interest owner that files a bona
fide protest to review, in a manner that protects confidential information, any unrecorded oil and
gas lease, unrecorded memorandum of oil and gas lease, or unrecorded agreement the applicant
is using to support the declaration in the affidavit, including the names of the parties to the
unrecorded oil and gas lease, unrecorded memorandum of oil and gas lease, or unrecorded
agreement; the date of the unrecorded oil and gas lease, unrecorded memorandum of oil and gas
lease, or unrecorded agreement; the mineral acres subject to the unrecorded oil and gas lease,
unrecorded memorandum of oil and gas lease, or unrecorded agreement; and the duration of the
unrecorded oil and gas lease, unrecorded memorandum of oil and gas lease, or unrecorded
agreement.
(c) Operations incident to the drilling of a well upon any portion of a unit covered by a
pooling order shall be deemed for all purposes to be the conduct of operations upon each
separately owned tract in the unit by the several owners of each separately owned tract. That
portion of the production allocated or applicable to each tract included in a unit covered by a
pooling order shall, when produced, be deemed for all purposes to have been produced from the
tract by a well drilled on it.
(7) (a) Each pooling order must:
(I) Make provision for the drilling of one or more wells on the drilling unit, if not
already drilled, for the operation of the wells, and for the payment of the reasonable actual cost
of the wells, including a reasonable charge for supervision and storage. Except as provided in
subsection (7)(c) of this section, as to each nonconsenting owner who refuses to agree to bear a
proportionate share of the costs and risks of drilling and operating the wells, the order must
provide for reimbursement to the consenting owners who pay the costs of the nonconsenting
owner's proportionate share of the costs and risks out of, and only out of, production from the
unit representing the owner's interest, excluding royalty or other interest not obligated to pay any
part of the cost thereof, if and to the extent that the royalty is consistent with the lease terms
prevailing in the area and is not designed to avoid the recovery of costs provided for in
subsection (7)(b) of this section. In the event of any dispute as to the costs, the commission shall
determine the proper costs as specified in subsection (7)(b) of this section.
(II) Determine the interest of each owner in the unit and provide that each consenting
owner is entitled to receive, subject to royalty or similar obligations, the share of the production
from the wells applicable to the owner's interest in the wells and, unless the owner has agreed
otherwise, a proportionate part of the nonconsenting owner's share of the production until costs
are recovered and that each nonconsenting owner is entitled to own and to receive the share of
the production applicable to the owner's interest in the unit after the consenting owners have
recovered the nonconsenting owner's share of the costs out of production;
(III) Specify that a nonconsenting owner is immune from liability for costs arising from
spills, releases, damage, or injury resulting from oil and gas operations on the drilling unit; and
(IV) Prohibit the operator from using the surface owned by a nonconsenting owner
without permission from the nonconsenting owner.
(b) Upon the determination of the commission, proper costs recovered by the consenting
owners of a drilling unit from the nonconsenting owner's share of production from such a unit
shall be as follows:
(I) One hundred percent of the nonconsenting owner's share of the cost of surface
equipment beyond the wellhead connections, including stock tanks, separators, treaters, pumping
equipment, and piping, plus one hundred percent of the nonconsenting owner's share of the cost
of operation of the well or wells commencing with first production and continuing until the
consenting owners have recovered such costs. It is the intent that the nonconsenting owner's
share of these costs of equipment and operation will be that interest that would have been
chargeable to the nonconsenting owner had the owner initially agreed to pay the owner's share of
the costs of the well or wells from the beginning of the operation.
(II) Two hundred percent of that portion of the costs and expenses of staking, well site
preparation, obtaining rights-of-way, rigging up, drilling, reworking, deepening or plugging
back, testing, and completing the well, after deducting any cash contributions received by the
consenting owners, and two hundred percent of that portion of the cost of equipment in the well,
including the wellhead connections.
(c) (I) A nonconsenting owner of a tract in a drilling unit that is not subject to any lease
or other contract for oil and gas development shall be deemed to have a landowner's
proportionate royalty of:
(A) For a gas well, thirteen percent until the consenting owners recover, only out of the
nonconsenting owner's proportionate eighty-seven-percent share of production, the costs
specified in subsection (7)(b) of this section; or
(B) For an oil well, sixteen percent until the consenting owners recover, only out of the
nonconsenting owner's proportionate eighty-four-percent share of production, the costs specified
in subsection (7)(b) of this section.
(II) After recovery of the costs, the nonconsenting owner then owns his or her full
proportionate share of the wells, surface facilities, and production and then is liable for further
costs as if the nonconsenting owner had originally agreed to drilling of the wells.
(d) (I) The commission shall not enter an order pooling an unleased nonconsenting
mineral owner under subsection (6) of this section over protest of the owner unless the
commission has received evidence that the unleased mineral owner has been tendered, no less
than sixty days before the hearing, a reasonable offer, made in good faith, to lease upon terms no
less favorable than those currently prevailing in the area at the time application for the order is
made and that the unleased mineral owner has been furnished in writing the owner's share of the
estimated drilling and completion cost of the wells, the location and objective depth of the wells,
and the estimated spud date for the wells or range of time within which spudding is to occur. The
offer must include a copy of or link to a brochure supplied by the commission that clearly and
concisely describes the pooling procedures specified in this section and the mineral owner's
options pursuant to those procedures.
(II) During the period of cost recovery provided in this subsection (7), the commission
retains jurisdiction to determine the reasonableness of costs of operation of the wells attributable
to the interest of the nonconsenting owner.
(e) On and after January 1, 2025, if a drilling unit contains the mineral interests of any
unleased mineral interest owner that has rejected an offer to lease pursuant to subsection
(7)(d)(I) of this section, an operator shall not drill or extract minerals from the drilling unit
before a pooling order is entered by the commission.
(f) (I) Notwithstanding any provision in this section to the contrary, the commission
shall not enter a pooling order that pools the mineral interests of an unleased mineral interest
owner if:
(A) The unleased mineral interest owner is a local government and the local government
has rejected an offer to lease pursuant to subsection (7)(d)(I) of this section; and
(B) The minerals subject to the local government's unleased mineral interests are located
within the local government's geographic boundaries.
(II) If a pooling order application proposes to pool mineral interests described in
subsection (7)(f)(I) of this section, the commission shall deny the application unless the
applicant amends the application to no longer pool the mineral interests described in subsection
(7)(f)(I) of this section.
(III) Nothing in this subsection (7)(f) affects, limits, or expands a local government's
authority to lease, refuse to lease, voluntarily pool, or otherwise dispose of the local
government's unleased mineral interests.
(8) The operator of wells under a pooling order in which there is a nonconsenting owner
shall furnish the nonconsenting owner with a monthly statement of all costs incurred, together
with the quantity of oil or gas produced, and the amount of proceeds realized from the sale of
production during the preceding month. If the consenting owners recover the costs specified in
subsection (7) of this section, the nonconsenting owner shall own the same interest in the wells
and the production therefrom, and be liable for the further costs of the operation, as if the owner
had participated in the initial drilling operations.
(9) As used in this section, unless the context otherwise requires, "local government"
means a home rule or statutory county, city and county, or municipality.

‹ Prev All Colorado sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.