Colorado Code § 25-8-702

Approval for commencement of construction
Open in Lexace · Ask the AI about this section
(1) No person shall
commence the construction of any domestic wastewater treatment works or the enlargement of
the capacity of an existing domestic wastewater treatment works, unless the site location and the
design for the construction or expansion have been approved by the division.
(2) In evaluating the suitability of a proposed site location for a domestic wastewater
treatment works, the division shall:
(a) Consider the local long-range comprehensive plan for the area as it affects water
quality and any approved regional wastewater management plan for the area;
(b) Determine that the plant on the proposed site will be managed to minimize the
potential adverse impacts on water quality; and
(c) Encourage the consolidation of wastewater treatment facilities whenever feasible.
(3) Ninety days prior to commencement of construction of an interceptor line, the entity
responsible for that line shall notify the planning agency and the division of such construction.
This notification shall be accompanied with a certification by the agency receiving the
wastewater for treatment that it has or will have the capacity to treat the projected wastewater
from that interceptor line in accordance with the treatment agency's site approval and discharge
permit. Within thirty days of receipt of notification, the planning agency, or the division, if a
planning agency does not exist, shall certify that the proposed interceptor line has the capacity to
carry the projected flow. In the event the entity responsible for an interceptor line does not have
the said certification from the treatment agency and the planning agency, the entity shall be
required to apply for a site location approval prior to commencement of construction.
(4) The decision of the division concerning approval of the site location or design may
be appealed to the commission. The commission shall hold a hearing on the site location or
design in accordance with the provisions of section 24-4-105, C.R.S., and the decision of the
commission shall be final administrative action for the purposes of section 24-4-106, C.R.S.