Colorado Code § 12-115-107

Board powers and duties - rules - definition
Open in Lexace · Ask the AI about this section
(1) (a) The board, annually
in the month of July, shall elect from its membership a chair and vice-chair. The board shall
meet at least annually and at such other times as it deems necessary.
(b) A majority of the board shall constitute a quorum for the transaction of all business.
(2) In addition to all other powers and duties conferred or imposed upon the board by
this article 115, the board is authorized to:
(a) (I) Adopt, and from time to time revise, rules pursuant to section 12-20-204. In
adopting the rules, the board shall be governed when appropriate by the standards in the most
current edition of the national electrical code or by any modifications to the standards made by
the board after a hearing is held pursuant to the provisions of article 4 of title 24. These standards
are adopted as the minimum standards governing the planning, laying out, and installing or the
making of additions, alterations, and repairs in the installation of wiring apparatus and
equipment for electric light, heat, and power in this state. A copy of the code shall be kept in the
office of the board and open to public inspection. Nothing contained in this section prohibits any
city, town, county, city and county, or qualified state institution of higher education from making
and enforcing any such standards that are more stringent than the minimum standards adopted by
the board, and any city, town, county, city and county, or qualified state institution of higher
education that adopts more stringent standards shall furnish a copy thereof to the board. The
standards adopted by the board shall be prima facie evidence of minimum approved methods of
construction for safety to life and property. The affirmative vote of two-thirds of all appointed
members of the board is required to set any standards that are different from those set forth in the
national electrical code. If requested in writing, the board shall send a copy of newly adopted
standards and rules to any interested party at least thirty days before the implementation and
enforcement of the standards or rules. The copies may be furnished for a fee established pursuant
to section 12-20-105.
(II) In the event of a conflict between the 2021 international energy conservation code,
the 2024 international energy conservation code, the model electric ready and solar ready code
developed by the energy code board pursuant to section 24-38.5-401 (5), or any energy codes
adopted by either a local government or divisions in the executive branch of state government
and the national electrical code or the standards adopted by the board pursuant to this subsection
(2)(a), the national electrical code or the standards adopted by the board pursuant to this
subsection (2)(a) prevail.
(b) Register apprentices and register and renew the registration of qualified electrical
contractors and examine, license, and renew licenses of journeymen electricians, master
electricians, and residential wiremen as provided in this article 115;
(c) Cause the prosecution and enjoinder, in accordance with section 12-20-406, of all
persons violating this article 115 and incur necessary expenses therefor;
(d) Inspect and approve or disapprove the installation of electrical wiring, renewable
energy systems, apparatus, or equipment for electric light, heat, and power according to the
minimum standards in the national electrical code or as prescribed in this article 115. With
respect to:
(I) An inverter-based hydroelectric energy facility generating one hundred kilowatts or
less, regardless of whether the facility is connected to utility or other distribution lines, an
inspector shall inspect a hydroelectric energy installation in accordance with the minimum
standards set forth in the edition of the national electrical code in effect on May 29, 2015;
however, if a micro hydro assembly manufactured for the purpose of generating electricity in a
micro hydro system uses an inverter that is listed and identified for interconnection service, the
inspector shall deem the system's equipment compliant with section 705.4 of the edition of the
national electrical code in effect on May 29, 2015. For purposes of this subsection (2)(d), a
"micro hydro system" means a hydroelectric generation system that generates one hundred
kilowatts or less.
(II) An induction-based hydroelectric energy facility generating one hundred kilowatts
or less, regardless of whether the facility is connected to utility or other distribution lines, the
installation of a hydroelectric energy turbine, induction generator, and control panel shall be
certified:
(A) To a listing standard by a field evaluation body or nationally recognized testing
laboratory; or
(B) By a professional engineer, by means of signing and stamping documentation of the
project, as required in a form and manner determined by the board, indicating that the
installation meets design criteria set forth in the Institute of Electrical and Electronics Engineers'
(IEEE) standard for interconnecting distributed resources with electric power systems.
(e) Apply any hydroelectric energy provisions of an updated national electrical code,
notwithstanding any provision in subsection (2)(d) of this section to the contrary, if the national
electrical code is updated to address hydroelectric energy specifically;
(f) Regulate a licensed master electrician, journeyman electrician, or residential wireman
who, acting within his or her scope of competence, supervises a solar photovoltaic installation
pursuant to section 40-2-128. On and after January 1, 2020, all photovoltaic electrical work for
installations of at least three hundred kilowatts, including the interconnection of the modules,
grounding of the modules, any balance of system wiring, and the customer-side point of
connection to the utility grid, must be performed by a licensed master electrician, licensed
journeyman electrician, licensed residential wireman, or properly supervised electrical
apprentices and must comply with all applicable requirements of this article 115, including
sections 12-115-109 and 12-115-115, and all applicable rules of the board.
(g) Review and approve or disapprove requests for exceptions to the national electrical
code in unique construction situations where a strict interpretation of the code would result in
unreasonable operational conditions or unreasonable economic burdens, as long as public safety
is not compromised;
(h) Conduct investigations and hearings and gather evidence in accordance with the
provisions of sections 12-20-403 and 24-4-105;
(i) Enter into reciprocal licensing agreements with the electrical board, or its equivalent,
of another state or states where the qualifications for electrical licensing are substantially
equivalent to licensure requirements in Colorado;
(j) Find, upon holding a hearing, that an incorporated town or city, county, city and
county, or qualified state institution of higher education fails to meet the minimum requirements
of this article 115 if the local inspection authority, including a qualified state institution of higher
education, has failed to adopt or adhere to the minimum standards required by this article 115
within twelve months after the board has adopted the standards by rule pursuant to this
subsection (2);
(k) Issue an order to cease and desist from issuing permits or performing inspections
under this article 115 to an incorporated town or city, county, city and county, or qualified state
institution of higher education upon finding that the public entity or qualified state institution of
higher education fails to meet the minimum requirements of this article 115 pursuant to
subsection (2)(j) of this section;
(l) Apply to a court to enjoin an incorporated town or city, county, city and county, or
qualified state institution of higher education from violating an order issued pursuant to
subsection (2)(k) of this section.
(3) (a) No later than September 1, 2023, the board shall promulgate rules requiring that,
to obtain an electrical permit under this article 115 on or after March 1, 2024, a permit applicant
must comply with the EV power transfer infrastructure requirements for multifamily buildings in
the model electric ready and solar ready code.
(b) (I) If the rules adopted in accordance with this subsection (3) conflict with a
provision of the building or zoning code, the rules prevail unless the provision provides for
greater access to parking supplied by EV power transfer infrastructure than is required by the
rules.
(II) If a provision of a local building or zoning code prevents a project or development
from complying with the rules adopted in accordance with this subsection (3), then the rules
prevail.
(c) (I) This subsection (3) applies to electrical permits for new construction of or for
major renovations of multifamily buildings that must comply with the EV power transfer
infrastructure requirements of the model electric ready and solar ready code.
(II) The board and the department shall not enforce the rules promulgated under
subsection (3)(a) of this section before March 1, 2024.
(III) If an electrical permit application is submitted to a local electrical inspection
authority before the enforcement date in subsection (3)(c)(II) of this section but an electrical
permit has not yet been issued, the local electrical inspection authority may determine how to
apply the requirements of the rules developed in accordance with subsection (3)(a) of this
section.
(IV) If a site development plan application is submitted to a local government and has
been approved by March 1, 2024, the local government may determine how to apply the
requirements of the rules developed in accordance with subsection (3)(a) of this section.
(d) (I) In promulgating the rules required under subsection (3)(a) of this section, the
board shall ensure all requirements adopted in the rules are in compliance with the requirements
of the national electrical code, as amended under subsection (2)(a)(I) of this section.
(II) Within ninety days after any update made by the energy code board to the EV power
transfer infrastructure requirements for multifamily housing in the model electric ready and solar
ready code, the board shall update the rules promulgated under subsection (3)(a) of this section
with the same changes. The board shall not enforce the updated rules until two hundred seventy
days after the updated rules are adopted.
(III) The rules promulgated under subsection (3)(a) of this section do not supersede or
preempt the safety requirements of other building codes, whether promulgated by an agency of
the state of Colorado or of a local government.
(e) Any installations or upgrades performed in accordance with the rules promulgated
under this subsection (3) on the load side of the utility meter must comply with this article 115,
including subsection (2)(a) of this section, which requires compliance with the national electrical
code, and sections 12-115-109 and 12-115-115, and all rules of the board.
(f) For all electric vehicle infrastructure or charging stations owned by an electric utility,
the utility shall comply with section 40-5-107 (3)(b).
(g) As used in this subsection (3) and in subsection (4) of this section:
(I) "Electric vehicle charging system" has the meaning set forth in section 38-12-601
(6)(a).
(II) "EV power transfer infrastructure" means any system that is used to charge electric
vehicles and that is addressed in or required by the model electric ready and solar ready code.
(III) "Major renovations" means renovations that change a minimum of fifty percent or
more of the parking area.
(IV) "Model electric ready and solar ready code" means the code developed by the
energy code board under section 24-38.5-401 (5)(a) to make buildings electric ready as specified
in section 24-38.5-401 (5)(b).
(4) (a) Notwithstanding any authority granted to the board by this section, the board
shall not promulgate rules prohibiting the installation of electric vehicle charging systems unless
the rules are narrowly drafted to address a bona fide safety concern.
(b) Any rule promulgated by the board that prohibits the installation of electric vehicle
charging systems is subject to judicial review as authorized in article 4 of title 24.

‹ Prev All Colorado sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.