The epoch for a survey using CCS83 coordinates shall be the published NGS or CSRC datum realization and epoch date of a published coordinate for a controlling station used for that survey. These surveys performed after December 31, 1999, shall be based on the âNAD83 (1992) epoch 1991.35â datum realization and epoch or a subsequent published NGS or CSRC datum realization and epoch.
‹ Prev All California sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.